Incremental Backup fails after last incremental backup set was deleted
I am using BE2012 sp1 with the latest 3 hotfixes. I was backing up exchange 2010 as a VM and also using the exchange grt option. Every week I have a full backup and the rest are incremental. After deleting the todays incremental, I tried to rerun the incremental backup job again. Looking at the data transferred it seems that the increm job was made against the deleted one and at the verification step it failed with Incremental\\Differential backup methods are not supported for this VM. 0xe00095b4
Why is the incremental job not running against the last available dataset and how can I fix this without running a full backup.
There is nothing wrong with what you are doing. Using your previous example, if you want to, you can restore everything up to C. This chain is still valid for restores, However, since you have deleted D, you cannot continue with the chain with another incremental backup. You need to start a new chain by doing a full backup.