Michael_Strelit
14 years agoLevel 3
Percent Complete will not display in BE 12.5
I am running BE12.5 in Windows 2003 R2. Everything is fine except that in the Job Monitor Window the Percent Complete column has N/A when backing up and is blank when verifying. All the files being backed up are local. A 2003 SBS server running BE11d has no problem displaying Percent Complete when backing up and verifying. How can I correct this?
From Tools\Options\Preferences enable
Display Progress Indicators
See the v12.5 Admin Guide page 160