Suggestion Required on Primary Site replacement
Environment
SFHA/DR = 6.1
OS = RHEL 6.3
Primary Site nodes = two
DR Site nodes = one
Query
We need to shift primary site nodes to a new location without SAN Storage. At new premises a new SAN will be attached with those nodes. We have the following action plan for this activity. Add your suggestion(s) to make this activity more mature.
- Switchover the application ServiceGroup to DR Site.
- Ensure both nodes at new primary site are:
- Placed properly
- Up and running
- Heartbeats are connected
- New SAN is connected with both nodes
- Configure new SAN in VERITAS Cluster/SF
- Adjust Disk group and Mount resources under ServiceGroup of Primary Site
- Ensure Primary and DR Site connectivity and bandwidth
- Configure Replication i.e.
- Remove RVG from DR site
- Run createpri and addsec command from DR (DR Site=Primary and Primary Site=Secondary)
- Start Replication from DR(Active) to Primary
- Backup application
- When Replication synced switchover to Primary Site (Primary Site=Primary and DR Site=Secondary)
Just to add, I don't think you can disable an online resource, so probably better to freeze the replication group.
Also you may want to disable VCS on nodes being transported before you take them down, so when you bring them up at the new site, VCS will not start and complain about the missing storage. Then you can re-enable VCS once you have configured all the new storage.
Mike