Backing up Lotus Notes
Hi guys, happy new year to all.
I have 2 jobs configured for Server A. One job is to backup OS and data files and another is to backup Lotus Notes database via LN agent.
Facing issue with the LN backup job. The backup starts, mounts tape and it does not proceed further but remains in active status. No completion neither will it fail with any error no.
Typically the job takes 3hours to complete, when the issue occured it ran 48 hours without any files being back up , tape remains loaded (we use a tape library) and it does not cancel even if I issued the command. I have to manually go into Server A to stop Netbackup service.
Things done
- Verified connection between master, media and client server ( The job that backs up OS and data runs well without issue)
- Restarted master, media and client server
- Disabled VSP
Anyone can advise how to further troubleshoot this issue?
Running NBU 4.5_FP6 ( aware its way passed EOL but we are due for upgrade in Q1 2010)
I have 2 jobs configured for Server A. One job is to backup OS and data files and another is to backup Lotus Notes database via LN agent.
Facing issue with the LN backup job. The backup starts, mounts tape and it does not proceed further but remains in active status. No completion neither will it fail with any error no.
Typically the job takes 3hours to complete, when the issue occured it ran 48 hours without any files being back up , tape remains loaded (we use a tape library) and it does not cancel even if I issued the command. I have to manually go into Server A to stop Netbackup service.
Things done
- Verified connection between master, media and client server ( The job that backs up OS and data runs well without issue)
- Restarted master, media and client server
- Disabled VSP
Anyone can advise how to further troubleshoot this issue?
Running NBU 4.5_FP6 ( aware its way passed EOL but we are due for upgrade in Q1 2010)