How to verify multiple AIR job is successful
Hello All,
Thanks for your always help and valuable suggestions.
I need some help regarding the below query.
I am performing some automated stress testing for the AIR job(through SLP), and i need to verify that AIR job is successfully completed.
The scenario is, as i already mentioned i am performing stress testing, so i will be using many AIR jobs parallely lets assume 10 jobs will be executed parallely for 'n' number of times(n would be a large value) under the single SLP with around 10 policies.
So after executing 10 jobs i need to verify that it is completed.
Now i know that by the status of SLP i can verify it using.
nbstlutil stlilist -U -lifecycle <SLP_NAME>
But when it comes under automation and i have to check for last 10 AIR jobs, so is there any other way to verify it?
Hi All,
I think there is no other way to identify that bacth of AIR jobs is successfully completed.
So i decided to use the below command for every backup on both the NBU.
nbstlutil stlilist -U -lifecycle <SLP_NAME> -backupid <BACKUP-ID>