Need to change the retention for specific backup policies/clients to infinity that are using SLP
Hello,
All our backup clients retention are set for 2 months and are determined by SLP. We have specific backup policies/clients that need their backups retained infinity. The retention for the polices box is grayed out and says Determined by SLP. I manually changed the backups (by command line using expdate) we currently have to infinity. However when the backup jobs run/complete they will expire in two months, how do I set those specific polices backups to infinity without affecting all our other backing which should retain the 56 days.
Netbackup Master Linux runnning 7.7.3
Windows 2012 Clients using backup client 7.7.2
Thanks in Advance
i am seeing 2 approach to achive your requirement..
1) create new SLP with infinity retenciton along with desired operations and assign the SLP only to this policy.(if this policy has other clients that does not need infiintiy rentecion , you need to create seperate policy for inifnity rentecion clients)
2) if SLP operations are not needed for this backups...select Storge unit in policy attributes, and then select desired retenction in schedules.
For future images
1. Copy SLP to SLP-infinite
2. Edit SLP-infinite to change retention of desired copy to infinite ( you may want to update the pool at that time as well! I forgot and put a bunch of infinite tapes in my 1 year pool. I had to recall and redo them, since you cannot change pools)
3. Edit schedules/policies to change SLP to SLP-infinite
To change existing image retention, you can use bpexpdate per image to manually set the expiration.
- Change/select the new SLP in Policy Attributes -> Storage Unit or else in the schedule: override policy storage.