Hi,
We are planning to do a POC with one of our customers. Is it possible to conduct a POC with an 8-core (single proc) CPU master server?
We can provide at least 32GB RAM
Thanks!!
There is sizing advice in the "Symantec NetBackup Backup Planning and Performance Tuning Guide Release 7.5 and Release 7.6"
http://www.veritas.com/docs/000004178