I have BE 12.5 running on windows 2003R2 x64; which is then backing up a windows server 2008SP2 X64 server. The 12.5 agent is installed, yet when a backup job runs against it, the nonpaged memory useage climbs to over 3 gig, once that happens, connectivity to the server ends, and the job fails. There are 2 promise arrays connected to the server, with a combined total of 20 TB storage. These are 2gig fibre connections through a sanbox 1400 switch.
Would anyone have any suggestions as to how I can stop this from happening?
Thx