Hi and thanks for your answer,
1) We're using SAP Agent controlled jobs, at this way, we cannot plan a Duplicate Job immediately after.
2) If we want to use this way, we have to connect the Tape Library with the VTL. This works, but this takes us the option to run jobs directly to the Physical Tape Library!
3) That's right, but we have to schedule the duplication job for everyday. We want to schedule all the duplication jobs one time!
Maybe I was misunderstood:
The overwrite protection is set correct. One server has a separate partition with 5 slots and tapes and the overwrite protection is set to 6 days.
That means, everyday from Mo-Fr there is only one tape which can be overwritten!
So if we schedule now 5 duplicate jobs for this server, for everyday one job, after the 5 jobs are finished, this works for one week.
(That means, I only can schedule a duplicate job after the backup job is finished!)
For example:
Mo. VTL-Tape VT1001 > Ph.-Tape PH1001
Tu. VTL-Tape VT1002 > Ph.-Tape PH1002
We. VTL-Tape VT1003 > Ph.-Tape PH1003
Th. VTL-Tape VT1004 > Ph.-Tape PH1004
Fr. VTL-Tape VT1005 > Ph.-Tape PH1005
Now next week, the VTL-Tapes will be overwrite: (VTL-Tapes are the same, Ph-Tapes not)
Mo. VTL-Tape VT1001 > Ph.-Tape PH2001
Tu. VTL-Tape VT1002 > Ph.-Tape PH2002
We. VTL-Tape VT1003 > Ph.-Tape PH2003
Th. VTL-Tape VT1004 > Ph.-Tape PH2004
Fr. VTL-Tape VT1005 > Ph.-Tape PH2005
But now, all 5 scheduled jobs are not working, because the content (index?) of the media has changed! (VTL-Tapes are overwritten)
It seems BE11d couldn't find the informations which I have given to the jobs!
I hope you understand my problem now.
Thanks and Regards,
Tobias