03-27-2012 08:17 AM
In 2010 R3 i had some jobs combined to a single job.
This single job had to backup 4 servers onto one tape!
With this single job, the tape had to rewind only once and could be used in one "streaming action".
Now if i create Backup Jobs for 3 Servers i will have 3 Jobs waiting for each other to complete and every job will tell the library to get the tape and rewind or wind forward to the next empty space.
Is this by design or can i create jobs as a single streaming job?
Maybe someone can explain this to me.
Thanks
Jürgen
05-30-2012 04:38 AM
Hello Sush,
Thanks for this note but this is not possible (too hard):
06-22-2012 03:00 AM
Hi,
The onmy solutins is to create Storage Pool with multiple Tape Drive.......
09-17-2012 12:10 PM
BE 2012 seems to take a long time with little data transfer when I have several small incrementals from the same server on disk, duplicated to tape. I'm assuming that it's rewinding the tape after every backup set. Can I get BE to write these (from the same job) all at once without the rewinds?