Hello,
I created a duplication job that starts after another job is complete. The total size of the master backup is 544 GB with software compression turned on (it backups to a RAID 5 array)
The duplication job works fine but i am a bit worried because it reports a size significantly lower than the master job (about 381 GB) It uses a single RAID 0 disk as its destination.
No compression set on the duplication job
Any idea of what is causing that ?
I use BE12.5 SP3
Thanks.