cancel
Showing results for 
Search instead for 
Did you mean: 

Backup Exec Pending Jobs

ejdrijin
Level 4

HI,

 

When you have lots of pending jobs in Backup Exec 2010 R3 (their status is Ready;No idle devices are available). How can I cancel all of these? Is it possible?

4 REPLIES 4

CraigV
Moderator
Moderator
Partner    VIP    Accredited

Hi,

 

If you restart the services this would cancel the jobs.

Thanks!

ejdrijin
Level 4

It will cancel the jobs running at that point in time, but the others which are: Ready;No idle devices are available will start.

pkh
Moderator
Moderator
   VIP    Certified
I think you need to cancel each of the jobs individually. You can't do a mass cancel

CraigV
Moderator
Moderator
Partner    VIP    Accredited

...the other option is to place those jobs on Hold (which you can do in 1 go) and then start them up individually.

Funnily enough I saw a TN around this which stated the issue was resolved in BE 11d and above...and I've had this issue before on BE 2010 R1/R2/R3..

Thanks!