Good Afternoon
We have recently moved to backup exec 12, and have been using it for around 2-3 months now.
All was fine untill the Daylight Savings event which happened in March 09 :( Since then we have had missed backups at weekends.
We have 2 scheduled tasks to run in Backup Exec
The first is a daily backup which runs Monday > Thursday - These backups areok and show in the History as being complete the odd errors with people leaving there email logged in etc, but mainly ok
The second is a Weekend backup which runs on a Saturaday when all the staff are out of the building. One of our sites has not had a weekend backup since the Time change.
The backup is set to run between 18:00 > 07:00 and is set to cancell if not complete within 10 Hours.
However the History of the job which was set to run on Saturday 25th April shows the following
Original Start Time 25th April 2009 19:00:00
Job Started 25th April 2009 18:00:00
The error that apears for the fail is
Error E00E020 - the job was scheduled to run, but the availability window closed before the job could end.
After reading some forums and posts, we restarted all the servers running backup exec after the Daylight Savings as we were aware there was a glitch in the service time VS the system time.
Backup Exec is running maily on dell PE 2900 servers, with Windows 2003 service Pack 1, Backup Exec is uptodate throu Live Update
Is there anything else I can try or anyone can suggest?
Cheers
Mike