Hi guys!

I have an odd issue with Backup Exec 2012.

This is how my backup environment look like :

  • 1 LTO-3 TAPE DRIVE With a 8-tapes loader. 
  • Backup Exec 2012 (full patched)
  • Rentention of 1 week (6 days)
  • Append time of 12 hours
  • 5 servers to backup
  • Ratio of compression between 1.75-1.85 on each tape
  • Schedule : all backup jobs begin at 00:00

The 3 servers are backup on 1 tapes, the 2 last on an other tape.

The 1 tape still have 100Go free space and on the 2nd tape, only 36Go are used.

The compression ratio is around 1.75, So. The tape 1 should have enough space for the 2 last servers.

My append time should be ok! The last backup end at 6h00AM.

I included all screenshots for helping you to understand

 

Can you help me on this guys?

 

Thanks!

1 ACCEPTED SOLUTION

Accepted Solutions

pkh
Moderator
Moderator
   VIP    Certified

Schedule : all backup jobs begin at 00:00

 

Your jobs should not overlap if you want the later jobs to append to the tape.  See point 4 of my article below for an explanation.

 

https://www-secure.symantec.com/connect/articles/why-my-job-not-appending-data-my-tapes

View solution in original post

11 REPLIES 11

Jaydeep_S
Level 6
Employee Accredited Certified

What is the Append period and the Overwrite period on the Media set? How are the last 2 jobs configured, Are they set to Append to media and use the same Media Set?

pkh
Moderator
Moderator
   VIP    Certified

Schedule : all backup jobs begin at 00:00

 

Your jobs should not overlap if you want the later jobs to append to the tape.  See point 4 of my article below for an explanation.

 

https://www-secure.symantec.com/connect/articles/why-my-job-not-appending-data-my-tapes

jedduff
Level 3

Hi Jay!

The append period is 12 hours and the overwrite period on my media set is 6 days

All my 5 servers have the same configuration.

 

 

Jaydeep_S
Level 6
Employee Accredited Certified

The cause may be because your jobs start all at one time. pkh has explained this beautifully in his blog

jedduff
Level 3

Oh, I'll check this out!

But, it is the same thing for BE 2012? If yes, this a flaw! I have to estimate the ending time of each backup, this is a little bit annoying and unproductive.

Another thing : the issue is always on the 2 last backups

Jaydeep_S
Level 6
Employee Accredited Certified

It is the same in BE 2012 as well.

jedduff
Level 3

Okidoki,

 

I did the change, I'll reply you tomorrow with the result

jedduff
Level 3

Ok Guys,

That didn't works :(

 

The first day, the backups were overlaping, so I edit the backup time between each job.

Now, no backup are overlaping, but the same issue occur.

My append time is 12 hours. (i double checked)

 

 

pkh
Moderator
Moderator
   VIP    Certified

Are you expecting the job which starts at 0430 to append to the 2nd tape?  If so, then it will not happen.  It correctly append to the 1st tape because both the 1st and 2nd tape are appendable and the 1st tape is older.

jedduff
Level 3

Hi pkh,

No, this is why is an issue. The 5:15Am is taken in a second tape, but I won't!

jedduff
Level 3

ah ah ah, I hate myself right now...I just found the problem!

The exchange job (the one who write a new tape) was set to "erase a media" instead of "append to the media"

SO, my issue was resolved after setting the job at different time. Thanks you guys for all the support!

Thank PKH!