cancel
Showing results for 
Search instead for 
Did you mean: 

Challenge with backup tasks

masroor1207
Level 0

Dear Support,

Here we have 7 Backup jobs as scheduled for daily baises and we have one backup which is scheduled for weekly i.e; on every friday. So, the challange is when the Daily backup is finished we are unable to make weekly backup in the same tape.

 

Could you please assit in how to modify copy right polocies.

 

Thanks

3 REPLIES 3

Gurvinder
Moderator
Moderator
Employee Accredited Certified

Make sure the same media set is selected for daily and weekly job. Make sure the append period is set to as long as you want to append to that tape. Then set the overwrite period for the amount of time you want to protect the tape from getting overwritten. Review this technote and set appropriate values as needed https://www.veritas.com/support/en_US/article.100017917.html 

CraigV
Moderator
Moderator
Partner    VIP    Accredited
 

kf2013
Moderator
Moderator
   VIP   

Are you using same media set?