02-10-2015 07:31 AM
I got 6 monthly backup jobs scheduled to run on the weekend, they backup to the same tape. One ran successfully to tape.
The rest failed with below error. For those 5 failed jobs, the elapsed time showed they ran for at least 7 minutes, at least 119 MB bye count before failed, percent complete shows 0% for all 5 jobs.
Job ended: Saturday, February 07, 2015 at 6:10:57 PM Completed status: Failed Final error: 0xe0000602 - A query for media on which the data set being read is continued was unsuccessful. Ensure that all media in the family have been inventoried and cataloged. Final error category: Backup Media Errors For additional information regarding this error refer to link V-79-57344-1538
I cataloged the tape successfully. Then clicked on the failed job, chose "run now" (don't know why it doesn't have "retry" option). Then the new job that I choose "run now" says "skipped" for status immediately. I tried "verified" the failed job, it completed successfully.
Not sure how I should understand this situation. Looks like the data were backed up but the % complete says 0, and status failed.
02-10-2015 07:57 PM
Is the Duplicate set to run on a schedule or immediately once the source job completes ?
If scheduled, are the original backup sets present for the Duplicate to run successfully ?
02-10-2015 08:15 PM
How long did you set the OPP to? If it is too short, the initial tapes in the series may have been overwitten during the job.
02-12-2015 10:46 AM
Monthly Duplicate jobs are scheduled to duplicate of the monthly full backups after they are completed successfully.
Full backup jobs scheduled to run in the morning (AM)
Duplicate backup jobs scheduled to run in the PM
So, the Full back Duplicate are at least 2hrs apart from each other.
The 5 monthly duplicate job failed to run on 2/7/15
I found out:
02-12-2015 10:51 AM
VJware,
Monthly Duplicate jobs are scheduled to duplicate of the monthly full backups after they are completed successfully.
Full backup jobs scheduled to run in the morning (AM)
Duplicate backup jobs scheduled to run in the PM
So, the Full back Duplicate are at least 2hrs apart from each other.
The 5 monthly duplicate job failed to run on 2/7/15
I found out:
02-12-2015 10:51 AM
tape in the Monthly Duplicate media set, overwrite protection = 1yr, appendable = 5 days