07-25-2014 05:26 AM
Hello!!!
I have SBE2010 R3 and IBM TL 3200 with 4 drives and 1 folder on server for b2d.
I want create duplicate job from my tape to folder(b2d).
how to specify a destination directory? how to perform backups in 4 threads on the number of drives?
Solved! Go to Solution.
07-25-2014 05:39 AM
07-25-2014 05:38 AM
Hi,
Not possible to run 1 job to 4 drives in BE...you need to split the job into 4 separate jobs.
You would also look at putting in a duplicate job after the main job/s completes, and the target would be the B2D.
Thanks!
07-25-2014 05:39 AM