Hi guys,
I have a BE 12.5 and a tape library TL 4000 with two drives. I need to backup 9 Tb in a weekend, the job completed in 46 hours... I want to optimize my jobs.
I thought, if I split the job in two I solve my problem :) , no, I earned new problem, the agents was superloaded and the job crash.
I have some questions.
Can I use the BE to do this or I need to use another tool, Netbackup for example?
The problem with the agents is normal?
Do you have some tips?
Thanks
Dan