β03-27-2015 12:27 AM
How to let the V-ray tier A (up to 6 cores) usage covered by V-ray tier B (+8 cores) license?
Hi,
We buy 10 V-ray tier B (+8 cores) license and have installed them.
We found Backup Exec 2014 detected we have installed 10 V-ray tier B (+8 cores) license and use 2.
Backup Exec 2014 also detected we have installed 0 V-ray tier A up to 6 cores) license and use 8.
How can we let the V-ray tier A (up to 6 cores) usage covered by V-ray tier B (+8 cores) license?
Thanks.
Solved! Go to Solution.
β03-30-2015 06:05 AM
The Tier B license will not activate against Tier A hardware even though less cores are involved. You need to go back to Tier-A licences for those systems (and possibly talk to the reseller if you bought the wrong licenses)
β03-27-2015 01:03 AM
β03-30-2015 06:05 AM
The Tier B license will not activate against Tier A hardware even though less cores are involved. You need to go back to Tier-A licences for those systems (and possibly talk to the reseller if you bought the wrong licenses)
β04-27-2015 12:13 PM
Hi,
Can someone explain the difference betweek Tier A and Tier B ?
Thanks