cancel
Showing results for 
Search instead for 
Did you mean: 

Suspending backup job due to backup exceeding backup window

mk128935
Level 5
Employee

Customer has a requirement where they want to suspend a backup job (let's say a full backup) if it exceeds their backup window (let's say 8 hours) but they want to restart from where they suspended at the next backup window. Is this something configurable in Backup Exec? 

I checked our schedule settings and options but I'm not sure if this is something that can be done.

I appreciate the advice on this.

1 ACCEPTED SOLUTION

Accepted Solutions

Colin_Weaver
Moderator
Moderator
Employee Accredited Certified

Nope but we are looking at resuming failed jobs from suitable points (instead of the beginning) for possible inclusion in a future version.

 

However this would probably be after a failure and not after something like the expiration of a configured window of time.

View solution in original post

1 REPLY 1

Colin_Weaver
Moderator
Moderator
Employee Accredited Certified

Nope but we are looking at resuming failed jobs from suitable points (instead of the beginning) for possible inclusion in a future version.

 

However this would probably be after a failure and not after something like the expiration of a configured window of time.