09-12-2018 05:31 AM
Customer has a requirement where they want to suspend a backup job (let's say a full backup) if it exceeds their backup window (let's say 8 hours) but they want to restart from where they suspended at the next backup window. Is this something configurable in Backup Exec?
I checked our schedule settings and options but I'm not sure if this is something that can be done.
I appreciate the advice on this.
Solved! Go to Solution.
09-12-2018 05:58 AM
Nope but we are looking at resuming failed jobs from suitable points (instead of the beginning) for possible inclusion in a future version.
However this would probably be after a failure and not after something like the expiration of a configured window of time.
09-12-2018 05:58 AM
Nope but we are looking at resuming failed jobs from suitable points (instead of the beginning) for possible inclusion in a future version.
However this would probably be after a failure and not after something like the expiration of a configured window of time.