03-22-2020 06:10 PM
Wgy Job Completed status: Completed with exceptions ?
The job log as attached.
03-23-2020 12:15 AM
03-23-2020 12:32 AM
Hello Marianne,
Than ks for your reply.
I have seen it. but, I'm not understand.
I don't know that what's job hs been exeption or what's job has been completed.
03-23-2020 12:46 AM
The job log tells me that the job has completed (there are similar stats for databases and System state):
|
but with VERY low dedupe rate (5.7%) :
Deduplication Stats::PDDO Stats for (BACKUP-SRV1): scanned: 176983320 KB, CR sent: 166825813 KB, CR sent over FC: 0 KB, dedup: 5.7%, cache hits: 92228 (5.4%) |
The 'exception' is a warning to tell you about about it.
You should not enable compression on a job that goes to dedupe storage.
See BE Admin Guide for details.
You are wasting your dedupe storage and will fill it up way too soon.
03-26-2020 10:20 PM
Hello Marianne,
Thank so much for your help.
The reason that I enable compression on a job is I want to solv the system state failure as solution below.
https://www.veritas.com/support/en_US/article.100033965
I try to find more solution for fix the system state failure but I cannot fix.