03-17-2016 12:01 PM
Hi,
I am new to backups all my duplicate jobs are failed with error
e000e020 - The job was scheduled to run, but the availability window closed before the job could start. There may not have been any destination devices available during the window, or the job may have been submitted to run when the window was closed.
I tried changing schedule timings,but not resolved
can anyone explain how to resolve this error, i followed previous post ont his error but i failed to resolve this.
Thanks
03-17-2016 01:05 PM
Check the TN below and see if it helps you:
https://www.veritas.com/support/en_US/article.TECH44658
Thanks!
03-17-2016 01:14 PM
Thanks for the response,I gone through the above link before, but i did not resolve my issue , stating time and ending time of the job is same,and status is missed.
is there anything i need to check other than above mentioned solutions?
Thanks
03-17-2016 01:16 PM
What version of BE are you on? Have you tried to recreate the job?
03-17-2016 01:19 PM
Its Backup Exec 2010 R2,i recreated one failed job today have to check.
03-17-2016 01:35 PM
BE 2010 R3 is what you should be running if, for some other reason, you can't upgrade to BE 15.
BE 2010 R3 uses the same license keys, and it's a straight-forward upgrade. You just need to stop the BE services, grab copies of the Data and Catalogs folders, and then run the upgrade. BE 2010 R3 fixed a number of issues over the previous 2 versions.
http://trialware.norton.com/files/fc/Backup_Exec_2010_13.0.5204_MultiPlatforms_Multilingual_DVD.iso
Just run LiveUpdate to get the latest service pack for BE 2010 R3 and then run it after that to get any subsequent patches.
Ideally you should upgrade to BE 15...
Thanks!
03-17-2016 08:15 PM
03-22-2016 10:03 AM
Hi
some job errors resolved , but still having errors in Backup exec 2014
e000e020 - The duration that this job is allowed to remain scheduled has passed. It will be rescheduled. Verify that storage is available and check the job's schedule settings. Ensure that there is enough time for it to begin running before it is considered missed.
when i check the schedule
its says like job is scheduled at 19:00 ,do i need to change the schedule?
Thanks