05-23-2014 06:39 AM
Hi,
I like to verify things.
If i have 2 nodes vcs with applications running on them,and i wish to patch or upgrade VCS,then it is enough to stop the vcs on both nodes and apply patches or upgrade.Right?Then restart VCS.
This is possible because the OS and VCS files on disks are different from application files on disks.Right?Normally OS and VCS files are on local disks and application is on SAN.Right?So if i patch or upgrade the VCS files,this will not overlap any of disk application files nor OS files on disk.
Then initial installed OS files on disk are different from VCS files on disk.Right?
The same if i like to add a new node to VCS,it is enough to stop vcs on nodes within cluster,then have in sync(edit) the llttab,llthosts,gabtab and main.cf on all the nodes,so i will next start vcs on all the nodes.right?
On Solaris if i wish to patch or upgrade VCS,i will use in this way-i create an liveupgrade BE,i will patch and upgrade it.
To conclude.The OS layer is below of VCS layer and this one is below of application layer.I take those things like different entities,and the OS files are not overlapped by VCS files on disk.
Any application runs at user mode.Right?
Thanks so much.
Solved! Go to Solution.
06-19-2014 08:35 PM
I reckon to have answered this in
https://www-secure.symantec.com/connect/forums/vcs-patch-0
G
06-19-2014 02:38 PM
I'm moving this to the Cluster Server forum to see if someone has some suggestions for you there.
06-19-2014 08:35 PM
I reckon to have answered this in
https://www-secure.symantec.com/connect/forums/vcs-patch-0
G
06-27-2014 07:38 AM
Hi,
Gaurav solved it.