cancel
Showing results for 
Search instead for 
Did you mean: 

Backup jobs being queued because DSSU relocation job

Enrique_Ayala
Level 3

I have the following configuration:

-> DSSU on Master Server X
Final Storage Destination TLD1

->TLD1 on Media Server Y
2 drives
Max streams per drive 8 
Maximum concurrent write drives 2

->Clients schedule/policy
Media multiplexing 8 
Allow multiple data streams No


My issue here is that when a relocation job is running and a client job is triggered, it is being queued  and starts until relocation job finishes. How can I allow that both kind of jobs run simultaneously?

 

I'll appreciate your suggestions. 

Thanks

 

 

1 ACCEPTED SOLUTION

Accepted Solutions

Nicolai
Moderator
Moderator
Partner    VIP   

Multiplexing does not work with DSSU relocation - you could also say there is no point in multiplexing if you already have disk that makes the tape drive run with optimal performance.

Only way to make space for both jobs is to limit DDSU relocation to one tape drive. That is documented in "How to Decrease The Number of Simultaneous Duplication Jobs That Will be Activated" in

http://www.symantec.com/docs/TECH44719

View solution in original post

1 REPLY 1

Nicolai
Moderator
Moderator
Partner    VIP   

Multiplexing does not work with DSSU relocation - you could also say there is no point in multiplexing if you already have disk that makes the tape drive run with optimal performance.

Only way to make space for both jobs is to limit DDSU relocation to one tape drive. That is documented in "How to Decrease The Number of Simultaneous Duplication Jobs That Will be Activated" in

http://www.symantec.com/docs/TECH44719