12-28-2008 07:25 PM
General question here: if a window spans midnight, do you have to exclude both days to prevent a policy from running? If so, how do I ensure the nightly backup starts the next night as desired?
For example, let's say I want to exclude the following policy from running on January 5th, as below. Given Monday's window spans midnight, is this policy sure to run just after midnight on the 6th? [assuming frequency based backup of 12hrs]
If so, and if I exclude BOTH the 5th and 6th, how do I get this policy to kick off on the night of the 6th as scheduled?
Solved! Go to Solution.
12-29-2008 06:15 AM
If freqquency based backups are scheduled and the window is open and if the frequency has been met and if there is no exclude then a backup will run. You need to exclude both days.
If possible, you could de-activate the policy by setting the attribute "Active. Go into effect at:" and set the date for when the exclude period is over. Unfortunately, that is limited to the entire policy and not a specific schedule.
12-29-2008 06:15 AM
If freqquency based backups are scheduled and the window is open and if the frequency has been met and if there is no exclude then a backup will run. You need to exclude both days.
If possible, you could de-activate the policy by setting the attribute "Active. Go into effect at:" and set the date for when the exclude period is over. Unfortunately, that is limited to the entire policy and not a specific schedule.