cancel
Showing results for 
Search instead for 
Did you mean: 

How to change override policy storage selection

MABaig
Level 3

 

Hi,

Got a query on an issue I am facing.

I am migrating Data from Tape Libraries to DD in new environment, can any one help me in selecting the override policy storage selection through cmd line, It is very much time consuming through GUI. All the SLP are already craeted I just need to assign the Schedules to the SLP respectively.

 

Thanks,

Abaig.

1 REPLY 1

Andy_Welburn
Level 6

the override policy storage selection through cmd line

My first thought was bpplschedrep (again!)

But:

I just need to assign the Schedules to the SLP respectively.

never used SLPs & not 100% sure with this comment.....