06-11-2014 12:17 AM
Dear Friends,
My backup senario is first backup goes on DD and it replicates on second DD at DR location and from DR DD it vault on Tape.
Now my question iis , i hvae to genrate a report that last monthly sucess backup report and after replication the all images are vaulte on tape or not .
please Advice.
Thank You
Solved! Go to Solution.
06-11-2014 08:29 AM
06-11-2014 02:05 AM
how did you define this replication(duplication).? does it though SLP?
if yes below command give you the backlog (images needs to get duplicated) information
nbstlutil reprot
this command nbstltutil do have some additional options which will give you the better info....
and for success are.. you can get from the GUI-----> reports..--> status of the backups..
06-11-2014 02:58 AM
Hi Nagalla ,
yes , it is SLP , but i have to check for last month all client backup sucess on head office DD and after raplication on DR DD the images sucessfully written on Tape .
06-11-2014 05:44 AM
If everything in a SLP has been completed then it follows that everything has been copied to tape.
If you have OpsCenter then just add the local and DR Master server in as being monitored by OpsCenter and then you can run the Storage Lifecycle Policy Reports>SLP Status report which will tell you everything about both sites for an immediate comparison and to see that it is up to date.
Even the standard OpsCenter should give you the months worth of information you are looking for.
While running the report in the console it even has links and if any are not complete you can click on it to be shown which are not complete including the Policy Name, image ID etc.
Hope this helps - OpsCenter is the easiest to deal with a report across two sites
06-11-2014 07:25 AM
06-11-2014 07:39 AM
Hi Mark,
it is single domain enviornment , so, there is only one master server in two node cluster and one node at DR and GCO is configured amongs HO and DR nodes .
so all data domain is conectcted from Head Office master server . now ,1st copy goes on HO DD and 2nd copy duplicate with SLP on DR DD, and now we do Tape Out (From DR DD to Tape) by netbackup Vault.
and some of the DR location Client 1st copy backup goes on DR DD and 2nd copy Duplicate by SLP from DR to HO the do the Tape out at HO location by Netbackup Vault
if i genrate SLP reports for that particuler day and it shows Images Not SLP Complete = 0 , 100% Copy Complete,Completed Copy Size 100%.
Can i consider that all images been moved on tape ???
Thanks You
06-11-2014 08:29 AM