Hello Experts,

I had a policy which i fired last night. It has 1 month retention as other policies from last 1 day its still in queue

with the  "awaiting resource xxx-hcart3-robot-tld-0 - No drives are available" message every time..

1:- I cancelled it and again fired it same is happening.

2:- Made the priority to 99999 but to no avail.

3:- Changed the storage unit :(

4:- If i fire other backup policy thats go to active state in a jiffy.

Pls suggest how to troubleshoot.

Server is on 7.6 Windows and these are solaris flat files backup.

Thanks,

1 ACCEPTED SOLUTION

Accepted Solutions

Marianne
Moderator
Moderator
Partner    VIP    Accredited Certified

If the pool and/or retention is different it will queue.

If new jobs have same retention and pool as the jobs already busy, it will be added to same drives/tapes.

NBU will give priority to jobs that do not need tape change, regardless of policy priority.

Also see explanation in this post: https://www-secure.symantec.com/connect/forums/start-high-priority-backup-job-front-other-queued-job... 

There is also a TN that explains this.

Understanding the Job Priority setting 
 http://www.symantec.com/docs/HOWTO105692

Extract: 

The following scenarios present situations in which a request with a lower priority

may receive resources before a request with a higher priority:

■ A higher priority job needs to unload the media in a drive because the retention

level (or the media pool) of the loaded media is not what the job requires. A

lower priority job can use the media that is already loaded in the drive. To

maximize drive utilization, the Resource Broker gives the loaded media and

drive pair to the job with the lower priority.

View solution in original post

5 REPLIES 5

Possible
Level 6
Accredited Certified
Does TLD 0 contains drives configured as hcart3?

Possible
Level 6
Accredited Certified
Does TLD 0 contains drives configured as hcart3?

H_Sharma
Level 6

Yes

Marianne
Moderator
Moderator
Partner    VIP    Accredited Certified

If the pool and/or retention is different it will queue.

If new jobs have same retention and pool as the jobs already busy, it will be added to same drives/tapes.

NBU will give priority to jobs that do not need tape change, regardless of policy priority.

Also see explanation in this post: https://www-secure.symantec.com/connect/forums/start-high-priority-backup-job-front-other-queued-job... 

There is also a TN that explains this.

Understanding the Job Priority setting 
 http://www.symantec.com/docs/HOWTO105692

Extract: 

The following scenarios present situations in which a request with a lower priority

may receive resources before a request with a higher priority:

■ A higher priority job needs to unload the media in a drive because the retention

level (or the media pool) of the loaded media is not what the job requires. A

lower priority job can use the media that is already loaded in the drive. To

maximize drive utilization, the Resource Broker gives the loaded media and

drive pair to the job with the lower priority.

Nicolai
Moderator
Moderator
Partner    VIP   

What happens if you set the policy start time to 5 minutes before the other policies ?

Netbackup has a algorithm that weights tape mount/dismount higher than a jobs with higher priority. Its quite normal to see other lower priority jobs take over a streams on a tape drive because those jobs fit the needed retention and volume pool