cancel
Showing results for 
Search instead for 
Did you mean: 

Schedule for basic disk storage Unit

cynthiapinto
Level 4

I haved enabled the disk stagging & the backups are writern on disk . Stagging schedule  is enabled for this &   frequency is 4 hrs .

but the job is not running as per the schedule due to this today the disk was full . I have  mannuany run the backup"Manual allocation to final destination" . This is successful but disk on the system is still full .

Why the data is not deleting automatically one the data is written to tape . 

I have selected high water mark as 98% & low water mark as 80%

1 ACCEPTED SOLUTION

Accepted Solutions

Marianne
Level 6
Partner    VIP    Accredited Certified

You do not have open windows during which duplication can run.

You need to open windows for each day 24x7 if you want duplications to run every 4 hours.

View solution in original post

12 REPLIES 12

RamNagalla
Moderator
Moderator
Partner    VIP    Certified

set high watermark as 80%

it does not delete the data untill it reach the high watermark even the duplications are successfull to make sure that you have the data avaliable in primary location for recovery purpose..

you need to set the high watermark bit low to get the images deleted from DSSU to cleanup the disk space..before it ran out of the space..

Marianne
Level 6
Partner    VIP    Accredited Certified
You did not mention your NBU version? Version is important because relocation and cleanup is different across versions and patch levels.

cynthiapinto
Level 4

NB 7.6.0.3  version we are using .  Thought there is a frequency set that the backup should start once in 4hrs its not running automatically

Marianne
Level 6
Partner    VIP    Accredited Certified

When you kick off a manual duplication, NBU will wait another 4 hours before automatically submitting another duplication job.
You may want to change the frequency to 2 hours and see what happens.

Only when backups have been successfully duplicated to disk can HWM cleanup apply.
Important to ensure that DSU resides on a dedicated volume in order for NBU to monitor and manage HWM.

To troubleshoot duplication and disk cleanup, ensure that the following log folders exist:

On master: admin

On media server: bptm and bpdm

PS: 

These TNs explain cleanup and relocation as from NBU 6.5:

Disk Staging Relocation Behavior: http://www.symantec.com/docs/TECH44719

Disk Staging Cleanup Behavior: http://www.symantec.com/docs/TECH66149 

cynthiapinto
Level 4

Thanks a lot .. We will monitor today & come update back tomorrow .

cynthiapinto
Level 4

No luck .. the disk stagging schedule is not sharted automatically  but the policy schedule is working fine

Marianne
Level 6
Partner    VIP    Accredited Certified
Please show us the staging schedule : bpschedule -label (sched-name) -U Also copy admin log to admin.txt and upload as File attachment.

cynthiapinto
Level 4

Hi Marianne,

 

how to collect admin logs ???

I have attached the screenshot.

 

 

cynthiapinto
Level 4

HI,

Below is the output.

 

./bpschedule -label CHN_BK_DS_Daily_Monthly -U

Schedule:              CHN_BK_DS_Daily_Monthly
  Type:                Full Backup
  Frequency:           every 4 hours
   Excluded Dates----------
      No specific exclude dates entered
      No exclude days of week entered
  Synthetic:           0
  Checksum Change Detection: 0
  PFI Recovery:        0
  Stage Priority:      90000
  Maximum MPX:         1
  Retention Level:     1 (2 weeks)
  Number Copies:       1
  Fail on Error:       0
  Residence:           INCHNMDBKP001-hcart3-robot-tld-0
  Volume Pool:         CRES_Monthly
  Server Group:        (same as specified for policy)
  Residence is Storage Lifecycle Policy:         0
  Schedule indexing:   0
  Daily Windows:

 

Marianne
Level 6
Partner    VIP    Accredited Certified

Have you created the log folder as per advice above?

If you have created admin folder under netbackup\logs on the master, you can open this folder in Windows explorer.

You will fild a log file for every day. 
Copy the one for yesterday (or today) to admin.txt and upload.

Have you not tried to reduce the frequency as suggested yesterday?

(Please try not to upload files in .docx format? 
They cannot be opened online. Screenshots saved as .jpg can be opened online).

Marianne
Level 6
Partner    VIP    Accredited Certified

You do not have open windows during which duplication can run.

You need to open windows for each day 24x7 if you want duplications to run every 4 hours.

cynthiapinto
Level 4

Thanks a lot Marianne . Now the schedules are perfectly running . I was in a assumption that if I select frequency no need haveing a open window