cancel
Showing results for 
Search instead for 
Did you mean: 

Suspend Duplication Jobs???

Bmitche
Level 5

I asked for this over 2 yrs ago....now I am begging for it. I have a need to suspend pending duplication jobs. We have a scheduled datacenter shutdown for Sunday morning at 5am. It is now Saturday morning at 5am(approx.). All backups to MSDP are done. I have approx. 10 pending duplication jobs waiting for tape drives. I would expect that on Saturday night sometime....I will have maybe 4-5 pending duplications left to run. I WISH I could just suspend/pause/hold those duplications rather than just canceling them. I know they will re-generate when I bring everything back-up.....but it would be cleaner if I could just put them on hold and release them when I am ready. Here is 1 case where it would come in handy. I have 2 tape drives....both are being used by duplication jobs, I have an urgent restore from tape, I want to pause the duplication job(I can wait till it finishes the image it is working on), then I can do the restore, and resume the duplication. We have checkpoints for backups....why not for duplications also? I know I can create duplication windows and such.....but it would be MUCH cleaner and easier for me(the user) if I could just pause the duplications.

3 REPLIES 3

ontherocks
Level 6
Partner Accredited Certified

The nbstlutil command provides a way for users to intervene in storage lifecycle operations.

option inactive with nbstlutil can be used for suspending/deactivating the duplication jobs

Deactivates future lifecycle operations on selected image copies, but retains the image information so that processing can resume.

 

Please check below pasted link :-

http://www.symantec.com/business/support/index?page=content&id=HOWTO43731&profileURL=https%3A%2F%2Fs...

Marianne
Level 6
Partner    VIP    Accredited Certified

Are you aware of the fact that SLPs can be scheduled in NBU 7.6?

See:

NetBackup 7.6 Feature Briefing - Secondary operation windows in SLPs

http://www.symantec.com/docs/TECH211111

 

PS:

I have also requested the ability to suspend running duplication jobs over here: 
https://www-secure.symantec.com/connect/ideas/storage-lifecycle-policies-slp-scheduling-windows-are-... 

Unfortunately no response from the Symantec employee who posted this Idea....

Joseph_Vidal
Level 3
Partner Accredited

You have (in 7.6) the possibility to suspend secondary operation processing within the Storage Lifecycle Policy itself. The options which are available are either "Active" or "Postponed".