cancel
Showing results for 
Search instead for 
Did you mean: 

BESR Backup job fails with Error EC8F17B7 Cannot create new recovery point set

cfchan
Level 3

 

BESR 2010 set limit the number of recovery point sets saved for this backup Maximum 1,

Start a new recovery point set Weekly, Around every 2 week prompt follow error when start new recovery point

Backup job fails with Error EC8F17B7: Cannot create recovery points for job: Preload (C:\) .
Error E7D1001F: Unable to write to file。
Error EBAB03F1: Not enough server storage is available to process this command.

 

Pls help

4 REPLIES 4

Markus_Koestler
Moderator
Moderator
   VIP   

BESR deletes the old recovery point only after the new recovery point is complete, which means you always need 2 times the diskspace of a complete backup set. I think this is the cause for the error message.

cfchan
Level 3

diskspace is enough, but still prompt error

Markus_Koestler
Moderator
Moderator
   VIP   

Hm, then I have only one idea left: Afaik you need 20-30% of free diskspace on the SOURCE volume to backup the volume successfull. There is a KB entry for that, but i can't find i at the moment.

cfchan
Level 3

anyone can help ?