Hi All,
I'd like to perform migration of my current physical Exchange Server 2007 from RAID-5 LUN into a server with fewer Hard Disk drive in RAID-1
is there anything that i should be paying attention into ?
Source:
5x 400 GB with RAID 5
Target:
2x 400 GB with RAID 1
I've calculated that the total content of the partitions on source server is just 198 GB, therefore I am dare to move the Exchange Server into the smaller disk drive.
Previously, Ive done restoration to a bigger LUN size and it doesn't go as I expected with the unknown partition cannot be used. So is there anything that i should do before during and after this process ?
Thanks.