cancel
Showing results for 
Search instead for 
Did you mean: 

System Recovery 2013 set incremental backup

momaymm
Level 5

I use SSR 2013  install on win 2008 x64 backup that server.   i define new job and setting job full run on  every saturday 10:pm . 

 

Why i cannot set option incremental backup for this job ?

1 ACCEPTED SOLUTION

Accepted Solutions

Markus_Koestler
Moderator
Moderator
   VIP   

Can you open a support ticket for this?

View solution in original post

29 REPLIES 29

criley
Moderator
Moderator
Employee Accredited

Are you saying that the option to create a recovery point set backup job (full + incremental) is greyed out?

Which volumes are you selecting?

TRaj
Level 6
Employee Accredited

Check this : http://www.symantec.com/docs/TECH205310

Please upgrade to SSR 2013 SP2 ( 11.0.2.47xx ). Refer :  http://www.symantec.com/docs/TECH214768

 

momaymm
Level 5

I backup c: drive all system.

momaymm
Level 5

now in installing SP2
 

momaymm
Level 5

install completed.

 

How to select job option increment  ?

Markus_Koestler
Moderator
Moderator
   VIP   

You have to create a recovery point set --> Users Guide page 81.

http://www.symantec.com/business/support/index?page=content&id=DOC6256

criley
Moderator
Moderator
Employee Accredited

Please answer my earlier question:

Are you saying that the option to create a recovery point set backup job (full + incremental) is greyed out?

momaymm
Level 5

On SSR2013 no option select incremental

momaymm
Level 5

I create point already in side the JOB Backup

Markus_Koestler
Moderator
Moderator
   VIP   

Please post the complete configuration of the backup job.

criley
Moderator
Moderator
Employee Accredited

What do you mean by that? Please be more specific. Perhaps a screenshot to show the problem will help ...

As mentioned already, a recovery point set job will create a full (first backup), then incrementals.

momaymm
Level 5

Summary job backup

 

 

you meaa i must create one job for  independent recovery point ?

Markus_Koestler
Moderator
Moderator
   VIP   

The first picture shows that the backup job is alreaday a recovery point set (Type field on the general tab).

TRaj
Level 6
Employee Accredited

Thanks Marcus for helping while I was not available.

Hope momaymm has got his issue resolved....

Let us know if it was resolved. We can help further if required.

 

momaymm
Level 5

when job incremental run backup c: ?

Markus_Koestler
Moderator
Moderator
   VIP   

Sorry can i don't understand what you mean?

momaymm
Level 5

Why job for incremeatal is not runing dali ?

markuskoestler
Level 3

Which schedule did you assign to the recovery point set? There you can select when to run the full and when to run the incremental backups !

momaymm
Level 5

I run full 2 time for this server..

 

 

 

i'm not sure ,   How to setup for incremental backup run daliy ?