Hello,
I would like to know if it is possible with BESR 8.5 to create a job (or a script) which would incrementaly backup a physical machine, transfer the incremental backup files to an ftp and convert these backup into a fresh virtual machine.
Here would be the steps:
1. locally backup the physical machine (incremental backup)
2. Ftp the files to an ESX machine
3. consolidate the backup files (optional step)
4. Create a virtual machine from the incremental backup files.
This would be a good DR for the physical machines.
Thanks a lot for you help and for your suggestions !
Eric