UPgrade from EV8 SP4 TO EV11
We currently use version 8.0 SP4 with Exchange 2007 and want to upgrade to the latest version of Evault for on a new exchange version (Exchange 2013).
My plan is to follow the following steps
1) From Ev8 ...
It looks like i have to do an in place upgrade to EV9 then install the cluster in windows 20012 R2 ...
can you give the steps to follow ?
My source
EV8 ( 2 nodes Cluster MSCS -> windows 2003 64 Bits)
Target
EV10 ( 2 Nodes Cluster MSCS --> ...
It is clear. i'll have to run the setup on both ev servers on the same time.
I will keep my fingers crossed for that everything goes well on both servers.
Many thanks
So if I understand after updating the first vault server. the second server will stop working ( because of comptability). I should update it
. Do you know if the services will be started on the second server. this part worried me a little.
Can you tell me if coexistence is possible between version 8 and 9?
can you tell me if coexistence is possible between version 10 and 11 ?
indeed in our environment we have two vault server (mscs clusters)
othewise we will have to do it ...