cancel
Showing results for 
Search instead for 
Did you mean: 
PrakashKodali
Level 3
since ‎03-27-2012
‎04-19-2021

User Statistics

  • 9 Posts
  • 0 Solutions
  • 0 Kudos given
  • 1 Kudos received

User Activity

Can anyone suggest on below .Backup taken in one server to a tape. To be restored in another server with another tape library. what are the steps to follow.   
Hi,we are trying to install NBU 8.0 client on SLES 11.0 on IBM Power series.It is giving error saying that ' Unsupported platform'Can anyone suggest how to proceed further.regardsK.Prakash 
Hi,Showing LTO5 Tape is full for 2 backups . Each backup is 300GB. Scheduled as weekly backup.Total it is around 600GB. But tape is showing as full, we can not take another backup. we have retention period of 2weeks. older backups should expire and s...
Hi, We are using nbu 7.6 for taking our db2 database backup. we have 2 drives in our tape library.When I run the backup, NBU uses two drives for taking the backup whic i dont want. I want only one tape should be used for a backup.  As tape is more s...
Hi, we are using netbackup 7.5 with db2. We would like to keep the tapes at offsite after each backup. Can someone tell me how to eject from the tape library and we may need to insert them on another day,  regards K.praksh
About
Kudos from