cancel
Showing results for 
Search instead for 
Did you mean: 
norbertg
Level 5
since ‎07-23-2012
‎02-14-2017

User Statistics

  • 105 Posts
  • 2 Solutions
  • 0 Kudos given
  • 12 Kudos received

User Activity

I would like to include the tape number as part of the email body response. Right now it's included in the attachment as part of the summary log but it would be way more convientent if I didn't have to open the attachment first to grab the detail. E...
Due to internal requirements regarding backup's one of our servers needs to be backed up several hours before the current backup schedule. I am wondering if it's possible to put a delay (about 3 hours) between backing up servers on the same job? Sca...
For the last 4 or so nights we are getting the following errors\exceptions once backup's complete:   The job completed successfully. However, the following conditions were encountered: During Granular Recovery Technology (GRT) operations, the neces...
I've only noticed in the last week but our BE media server has an hour delay before starting it's back up once the previous server has finished. I have tried re-arranging servers on which tape it get's backed up to over our dual library but hasn't ma...
We have a dual library with 2 separate jobs. Job 1 backs up 3 servers to drive 1, Job 2 backs up another 3 servers and to drive 2. What I would like to do is once the backup's complete is move the tapes to corresponding slots e.g once Job 1 finishes...