Background:
Running BE2012 1798.1244
OS 2008
We generally backup to disk and retain that information for 1-4 Weeks. After most B2D jobs complete a duplicate job kicks off and duplicates the data to tape to be retained for 1 or 7 years.
My issue:...
We run two SEV(Symantec Enterprise Vault) for Exchange server running V10 Sp1 in two differant data centers. The SEV stores/partitions are replicated between the two machines using DFSR. This is a basic SEV setup with no DA or CA. I need to upgrade...
Environment:
BE 2012 SP2
Exchange 2007 SP3 CCR cluster
Windows 2008
Problem:
GRT Incremental backups take 3 days to complete while the full only takes a 1 day.
According to this Symantec article http://www.symantec.com/business/support/index?page=c...
Hello,
We run 1 server that backups all of our server. We use backup exec 2012 on this server with all the latest patches. It is running on a Windows 2008 server.
We utilize B2D, Deduplicated storage and a Dell tape library.
I need to know what...
Thanks Imosla,
The "Overwrite recyclable media.." option was not set and I have now set it. We will see in time if that really help.
Unfortunately I doubt it will because the backup set is not recyclable because other backup sets depend on it. I j...
Ajay,
I had already seen that document. As you can see it is no help at all. It doesn't provide any detail as to what the procedure for upgrading building block is.
Hopefully there is a better document out there. or at least someone that knows how...
Thanks for pointing out that the document is for those versions. I am not sure why i thought it was for all versions :)
One full backup a week. Used to be one incremental backup a day but I have reduced it recently since the jobs are taking so long...