Recently, I found that there are always a tape drive free even there are many pending job in the database.
Refer to the picture, TLD 2 & 3 are located at the same site and share the same resource pool. Perviously, it will use all drive during the da...
Dear all,
Due to the tape drive problem, one of the tape had been corrupted. After some checking, I found that it contains the data on few duplication jobs. I will need to do the duplication again, how can I do so? Can I do it by SLP?
Thanks, John
My NetBackup master server and media server are running at Windows Server 2003 with version 7.1.
I performed some backup on the oracle database perviously which I would like to restore it as a file base to UAT. Any idea how can I do so?
Also, I hav...
Hello, I will need to setup a Linux server at DMZ while my master server and media server are located at internal LAN. I checked the knowledge base which told me that it will only require TCP port 13724 and 1556 bi-directional. Is it correct? Any oth...
I would like to exclude the last Friday of the month as the monthly backup will take over at that time. How can I set it with an easier way, for example by clicking something or command? Because I don't want to do it manually on scheduling which is v...
It is a good idea! Thanks for your recommendation. However, I would like to ask if I turning on Multiple Data Streams in the policy, will the duplication of the policy use Multiple Data Streams too? If not, how can I configure the duplication using M...
In fact, the backup windows is not enough sometime as we have few TB need to be backup at weekend. Some backup jobs are fail because of exceeding backup windows at weekend, so that the backup windows is large.
I try to modify the schedule by running ...
I tried this method already. However, for example, Aug, it will run n the last week even I didn't highlight last week.....
If weekly and monthly backup run at the same time, it will run monthly backup first, but still weekly backup will run later.......