Backup Exec 16 Exchange GRT backup error with deduplication
After windows in place upgrade from windows server 2012 R2 to 2016, and BE services started normally and all job are running successfully, except Exchange and VMware GRT backup failed with the following error. Final error: 0xe0001203 - An error occurred while creating or accessing the directory specified for this operation. Check to make sure that the B2D folder and/or the temporary path specified for this operation are valid. V-79-57344-4611 - An error occurred creating or accessing the directory \\.pdvfs\servername\2\BEData specified for this operation. Ensure that the directory is accessible and can be written to. I changed storage from deduplication disk to tape drive and job success . FP 2 and latest HF 128051are installed .Solved3KViews0likes3CommentsBacking up SQL databases and transaction logs Clarification needed.
I am trying to make sense of the following statement from atech article which I will be providing a link below and I am not sure if I am understanding the context properly, "Additionally, Backup Exec runs a full backup when you select the Automatic or Log backup methods if a full backup was not previously run on the database." Does that statement mean that If I have selected the following option, "Log - Back up and truncate transaction log" without scheduling a full backup to run that day it will automatically run a full backup then backup the log and trucate them every day that it is schedule for? or is it referring to only the firstfull backup? The reason why I am asking is the first job backup method is set by default to do a full backup of the entire database. Then the second job you can specify to do one of 9 options from log to copy, full etc.. Lastly by selecting to do a log backup and truncation is it suppose to show up as incremental backup as the Job Type under the for the selected server under backup and restore as seen below? https://www.veritas.com/support/en_US/article.000108901Solved1.2KViews0likes1Comment