Exchange 2013 GRT backups - how can I speed up the backup?
Hello, we have two mailboxes servers hosted on vmware and 30 databases configured in a DAG between the two servers. currently I have a policy set for a 15 hour window for a full GRT backup during the night (between 17-8), and 7 jobs limit per policy. lately the backup fail to complete in the time frame we have. and this is after we lengthenedit already. other than increasing the job limit, how can I speed the backups? the servers seem to struggle as it is (I think the backups are causing them to lose connection with the witness server- I never had the time to look into it) I consideredticking the 'disable client side deduplication' on the policy, since we are using a netbackup appliance with deduplication enabled. but I was unsure of where it moves the workload.. thanks in advance for the help1.3KViews0likes5Comments