limit has been reached for the logical resource netbackup 7
Hi,
I have a tape library with 4 drives . I have configured the diskstagging & configured the schedule to write tha backups from disk to tape .
ThoughI have 4 drives when the duplication happens it takes either 1 or 2 drives & rest backups will stand in queue .
Do we need to so any settings in NB so that 4 pararrel jobs can run ?
Below is the details status of two polices
5/27/2015 08:03:02 - Info nbjm (pid=18683) starting backup job (jobid=9545) for client hjcmnbkplin01, policy __DSSU_POLICY_hjcmnbkplin01-ds-CIO_D_Tue_Thu, schedule hjcmnbkplin01-ds-CIO_D_Tue_Thu
05/27/2015 08:03:02 - Info nbjm (pid=18683) requesting NO_STORAGE_UNIT resources from RB for backup job (jobid=9545, request id:{B23B81C4-0418-11E5-BA76-A39A5C220FD1})
05/27/2015 08:03:02 - requesting resource hjcmnbkplin01.NBU_CLIENT.MAXJOBS.hjcmnbkplin01
05/27/2015 08:03:02 - requesting resource hjcmnbkplin01.NBU_POLICY.MAXJOBS.__DSSU_POLICY_hjcmnbkplin01-ds-CIO_D_Tue_Thu
05/27/2015 08:03:02 - Info nbrb (pid=18626) Limit has been reached for the logical resource hjcmnbkplin01.NBU_CLIENT.MAXJOBS.hjcmnbkplin01
--------------------------------------
05/27/2015 17:42:35 - Info nbjm (pid=18683) starting backup job (jobid=9555) for client hjcmnbkplin01, policy CIO_Catalog, schedule Full
05/27/2015 17:42:35 - Info nbjm (pid=18683) requesting STANDARD_RESOURCE resources from RB for backup job (jobid=9555, request id:{A8D4FD58-0469-11E5-BBAA-35B586774A9A})
05/27/2015 17:42:35 - requesting resource hjcmnbkplin01-hcart-robot-tld-0
05/27/2015 17:42:35 - requesting resource hjcmnbkplin01.NBU_CLIENT.MAXJOBS.hjcmnbkplin01
05/27/2015 17:42:35 - requesting resource hjcmnbkplin01.NBU_POLICY.MAXJOBS.CIO_Catalog
05/27/2015 17:42:35 - Info nbrb (pid=18626) Limit has been reached for the logical resource hjcmnbkplin01.NBU_CLIENT.MAXJOBS.hjcmnbkplin01
05/27/2015 17:44:35 - Info nbjm (pid=18683) Waiting in NetBackup scheduler work queue on server hjcmnbkplin01
05/27/2015 17:46:35 - Info nbjm (pid=18683) Waiting in NetBackup scheduler work queue on server hjcmnbkplin01
05/27/2015 17:48:35 - Info nbjm (pid=18683) Waiting in NetBackup scheduler work queue on server hjcmnbkplin01
Check Max Jobs per Client in Host Properties -> Master -> Global Attributes.
The default is 1.
Change it to 4 as a minimum.Also check STU config for tape library - number of concurrent drives should match the number of drives in the robot.
PS:
Please reply to your unresolved forum posts?
Excluding the directories from backup
Thanks!