Parent Job and Child Job
- 11 years ago
1)Parent job handles various preprocessing and post-processing for backups. It will initiate the child jobs to handle the backups on the Master.Cancelling a parent job will cause all child jobs to be canceled as well.
Parent job initiates child jobs and act as a root.Parent jobs do not count towards the Global Attribute "Max Jobs Per Client",Limit Jobs per client.
parent job will only appear for certain types of backups like sap DB,oracle DB,Catalog backup,multy stream jobs.
Procedure to verify parent and child job: https://www-secure.symantec.com/connect/forums/how-find-parent-job-child-job
2)In the NetBackup Administration Console, the Activity Monitor Services tab or Daemons tab displays the status of NetBackup services or daemons on the selected master server.U can stop and restart over there.
If OS level it is Kill_9 and netbackup level bp.kill command(It will terminate all the running processes)
3)http://www.symantec.com/business/support/index?page=content&id=TECH17904
4)if you want to configure in library then it depends on ur tape library make and model
You can configure through opscenter..It is a free comes along with the NBU.also u can refer below link
https://www-secure.symantec.com/connect/blogs/howto-check-netbackup-tape-drive-status-and-generate-email-alert-once-any-drive-down
5) I would suggest you to raise a case with HP to resolve.
I see so many links in google for this particular HP -Error
http://h30499.www3.hp.com/t5/Tape-Libraries-and-Drives/Fault-code-3200-Hard-Shuttled-Jammed-MSL6000/td-p/3798249
Suggestion/Request: Please dont combine all diff questions in a single post .