Joel_Watz
20 years agoLevel 2
Tapes get out of order duing 3 week tape rotation
I have a 3 week tape rotation cycle and have created 21 different backup schedules with 21 different media sets. After putting in the tapes into my msl600 tape library along with doing the catalog and inventory, I moved each tape to its appropriate backup schedule. However, after the job as run, the wrong tape gets used. For example, if I am on Monday_week_1, the media set designated for this day ends up using tape 5 instead of tape 1. Each tape has a bar code that is recognized in BE as verified.What is the best way of making sure that the backup jobs will select the appropriate tape everytime?