Phil_Rosier
9 years agoLevel 4
How to change report schedule on mass ?
Hi,
I have a Data insight 5.0 system with several hundred scheduled reports which we need to change the time that they run. Is there a way of changing the report schedules on mass via the command line, i.e. reportcli or sqlite; or do we need to edit the schedule for each report individually through the GUI?
Kind regards
Philip