NB_IT
15 years agoLevel 2
Calendar Schedule
Hi all,
We want to backup our master server every Sunday directly on tape. The last Sunday of every moth, the tape has to be assigned to a volume pool other than the volume pool of the policy (--...
- 15 years agoThanks for all your replies! :-) This sounds as if I'll get the desired result with the schedules I had in mind.
I have now set up two schedules:
schedule 1: 1st, 2nd, 3rd, 4th Sunday with retention 1 month
schedule 2: Last Sunday with retention 1 year
If I understood correctly, schedule 2 should be the one executed on the last Sunday in month since the retention is higher than in schedule 1.
I'll try to go with this an will see if it works. The idea of switching to the 1st Sunday is good but I would have to change our whole company backup rotation schedule to implement this strategy. But I'll definitely will consider it if the setup above won't work.
Fabie