Backup to tape in sequential tape order
Our nightly backup was running filling the tapes sequentially starting with slot 1 and ending with slot 8. The tape drive broke and was replaced by the exact same type of drive. . Prior to replacing the hardware our tapes were backed up sequentially. This was nice as we label our tapes Monday 1,2,3 and so on. As we overwrote tapes we always use the same sets of tapes. SInce the hardware was replaced the backup goes to tapes randomly making the labels incorrect. How do I set the software to write to the tapes sequentially? I have read the help included with the software and manuals on line. I don't see that anywhere unless I am using wrong terminology.
Thanks for any help.
It is quite difficult to get BE to use the tapes in sequence in a tape library. Any small error in any job will throw the sequence off. Suppose you have 10 tapes and the error occurred at the 5th tape, the next job will then pick the 6th tape because it it the oldest. Even if you put all the tapes in the scratch media set, BE will still use the 6th tape because it has the oldest allocate date.
Read my article below for an explanation on why it is better to let BE manage the tapes on your behalf.
https://www-secure.symantec.com/connect/articles/must-mondays-backup-be-monday-tape