basic disk retention level
I have created a BasicDisk (no license to do anything else). Policy created to backup to the basic disk with infinite retention period. From the basic disk I have staging schedule to copy the backups on the disk to tape. This works, however the retention level is set to 2 weeks. I know the default retention level for a basic disk is set to Level 1 which is 2 weeks, but I can not see where I can change the rentenion level for the basicdisk. I know I can set the retention level on the Master but other policies are using level 1 so can not do that.
~Unless there is another way to backup to disk then to tape with infinite retention level without buying additional licenses
Both backup copies (disk and tape) have INFINITY retention.
The reference to '2 weeks' in the staging job is a 'red herring'. You can ignore it.
The retention in the disk staging config is linked to the DSSU Frequency.
See this: https://www.veritas.com/support/en_US/doc/123711489-126541862-0/v41615072-126541862Internally, NetBackup uses the retention level 1 setting for scheduling purposes with disk staging storage units.....
...
Make sure that the frequency period is set to make the backups occur more frequently than the retention level 1 setting indicates. (The default is two weeks.)