Hi all.

I would like my full backups to run every first weekend of the month. I have configured my schedules the following way:

- FULLs. Follow the calendar. Included day: First Friday of the month. Execution window: Fri 6pm to Mon 6 am.

- CINCs. Every day. Execution window: It will run from 6pm till 6 am every day except Sat and Sun.

My questions are:

Tomorrow is the first Friday of the month. Imagine that I have 30 jobs queued on Fri at 23.59. When it's Sat 00.00, will NBU cancel the 30 jobs that are queued? Remember the execution window is for the whole weekend but the included days option is configured only for the first Friday.

If the jobs are not cancelled, but some fail let's say at Sat noon, will they be retried?

---

I've configured the included days to first Friday of the month only because if I include the first Sat or Sun, they may be on different weekends compared to the first Friday of the month. For instance, in October.

 

  • If you are on NetBackup 7.6 or above you will be fine.

    In earlier versions they would fail with a missed backup window but after NBU 7.6 they are fine

    With earlier versions you can tick the "Run after runday" box on the schedule to get around it

12 Replies

  • Thanks guys, will take a look at this licencing stuff on due time.

    Mark, I didn't mean clash as in being active at the same time, but as in starting and queueing the CINC on Sat at 00.00 and either running after the full backups finish or failing with error 196 because the execution window is over.

  • It wont drop it into the queue until the full backup finishes .. but if it has an open window it will drop it in the queue as soon as the full one finishes .. so you may want to get a general idea of how long the full one takes and decide when you really need the first CINC to run