I've gone through the 7.5 Admin guide - vol 1, but would like to get confirmation. For a successful synthetic backup policy, are these the 4 required schedules ?

- Differential Incremental backup (non-synthetic)

- Full backup (non-synthetic)

- Cumulative Incremental backup (synthetic enabled)

- Full backup (synthetic enabled)

I'm tyring to avoid having redundant schedules. Thank you in advance.

  • The synthetic cumulative incremental is not required.

    You only need the cumulative if you are spacing out the fulls a long way (and the only reason you need that is that it saves time.)

    i.e. you could schedule the following:

    1st full backup needs to be a regular non-synthetic backup.

    Subsequent incremental backups (non synthetic) run Monday through Friday).

    Synth Full then runs every weekend to create a new full building off the previous full and the incremental backups.

     

    Or

    1st full backup needs to be a regular non-synthetic backup.

    Subsequent incremental backups (non synthetic) run Monday through Friday).

    Synth Cumulative  then runs every weekend based off the weeks incremental backups.

    Synth Full runs once a month to create a new full backup based off the last cumulative incremental backup and the regular incremental backups since the last full.

     

    Deb

     

2 Replies

  • The synthetic cumulative incremental is not required.

    You only need the cumulative if you are spacing out the fulls a long way (and the only reason you need that is that it saves time.)

    i.e. you could schedule the following:

    1st full backup needs to be a regular non-synthetic backup.

    Subsequent incremental backups (non synthetic) run Monday through Friday).

    Synth Full then runs every weekend to create a new full building off the previous full and the incremental backups.

     

    Or

    1st full backup needs to be a regular non-synthetic backup.

    Subsequent incremental backups (non synthetic) run Monday through Friday).

    Synth Cumulative  then runs every weekend based off the weeks incremental backups.

    Synth Full runs once a month to create a new full backup based off the last cumulative incremental backup and the regular incremental backups since the last full.

     

    Deb